Smart Exercise Tracker · For iPhone
Workout tracking,
without the clutter.
Smart weight suggestions, a lock-screen rest timer, and a calm black-on-white design that stays out of your way.
The basics, done right
Just lift.
Open the app, tap start. Everything else is already figured out.
- Quickstart The app remembers where you left off and queues your next workout automatically — no menu diving.
- Smart prefills Weight and reps are suggested from your last session. Confirm in a tap or adjust as needed.
- Rest timer on your lock screen Log a set, lock your phone. The timer runs as a Live Activity — no unlocking to check.
For when you want more
Goes as in-depth
as you need.
The simple surface hides a lot of capability. It's there when you want it.
- Interchangeable lifts Each slot in a workout can hold multiple exercise options — swap on the fly without breaking your flow.
- Progress & estimated 1RM Charts for any lift, with your estimated one-rep max calculated over time.
- Body weight tracking Log your weight alongside your strength — weekly reminders, nothing more.
- Workout variants Heavy/light, volume/intensity, A/B splits — set them up once, and the app alternates automatically.